Adaptation of the 110kV Transmission Line No. 132/3 TS Kula – TS Srbobran
A safer and more reliable system completed in record time

Twice as fast as planned — we completed the adaptation of the 110kV transmission line No. 132/3 TS Kula – TS Srbobran. After more than sixty years of operation, and the effects of time and weather conditions, the facility was successfully modernized in just six months.
Through this adaptation, we ensured a stable power supply, extended the lifespan of the line, and increased system reliability. Our flexible and agile approach enabled us to engage a larger team, allowing for swift and efficient project completion without compromising quality.
The works included the removal of redundant wire crossings, phase sequence alignment in substations, replacement of conductors, and installation of new insulation equipment. The system was simplified and its safety enhanced.
With this project, we once again demonstrate that at Kodar, we don’t just build infrastructure — we build safety, reliability, and lasting trust.
Similar Projects

Finished 2022.
Reconstruction of the 110/20 kV Bela Crkva Substation
No Interruptions for Users – Successful Reconstruction of a Key Substation

Investor: Elektrodistribucija Srbije

Finished 2023.
110 kV Underground Cable Line TS Belgrade 1 – TS Belgrade 6
4.35 km of cables through Belgrade – works executed in 50–100 m sections without traffic disruption

Investor: EMS AD

Finished 2022.
Public Lighting – Monrovia, Liberia
Over 1,000 reinforced concrete poles and 2,500 streetlights – our delivery set a benchmark for future electrification projects across West Africa

Investor: MBH POWER AND ENERGY DMCC