Projects

In progress.
400 kV Transmission Line from Bitola to the North Macedonia–Albania Border
Kodar Energomontaža is participating in the construction of the first electricity interconnection between North Macedonia and Albania. The company has been entrusted with the cons...

Finished 2025.
Adaptation of the 110kV Transmission Line No. 132/3 TS Kula – TS Srbobran
A safer and more reliable system completed in record time

In progress.
Transmission Line 2×400 kV / 400 kV Čevo – Pljevlja
We’re building energy bridges between Montenegro and Europe

Finished 2024.
Electrical power connection for the wind farm on Crni Vrh
At an altitude of 800 m, we built a 150 MW connection and a 17 km transmission line.

Finished 2024.
110 kV Transmission Line SS Guča – SS Ivanjica
A project which went one step further

Finished 2023.
110 kV Underground Cable Line TS Belgrade 1 – TS Belgrade 6
4.35 km of cables through Belgrade – works executed in 50–100 m sections without traffic disruption



