
Adaptation of the 110kV Transmission Line No. 132/3 TS Kula – TS Srbobran
A safer and more reliable system completed in record time


Twice as fast as planned — we completed the adaptation of the 110kV transmission line No. 132/3 TS Kula – TS Srbobran. After more than sixty years of operation, and the effects of time and weather conditions, the facility was successfully modernized in just six months.
Through this adaptation, we ensured a stable power supply, extended the lifespan of the line, and increased system reliability. Our flexible and agile approach enabled us to engage a larger team, allowing for swift and efficient project completion without compromising quality.
The works included the removal of redundant wire crossings, phase sequence alignment in substations, replacement of conductors, and installation of new insulation equipment. The system was simplified and its safety enhanced.
With this project, we once again demonstrate that at Kodar, we don’t just build infrastructure — we build safety, reliability, and lasting trust.
Similar Projects

In progress.
Transmission Line 2×400 kV / 400 kV Čevo – Pljevlja
We’re building energy bridges between Montenegro and Europe

Investor: CGES

Finished 2022.
Expansion of the Kragujevac 2 and Kraljevo 3 substations
Higher Voltage for a Stronger Central Serbia Grid

Investor: EMS AD

Finished 2024.
110 kV Transmission Line TS Guča – TS Ivanjica
A project which went one step further

Investor: EMS AD