Projects

Finished 2025.
Doljevac Solar Power Plant
An example of a smart energy transition

Finished 2024.
Electrical power connection for the wind farm on Crni Vrh
At an altitude of 800 m, we built a 150 MW connection and a 17 km transmission line.

Finished 2024.
110 kV Transmission Line TS Guča – TS Ivanjica
A project which went one step further

Finished 2023.
SPP Lebane, Novo Selo
A solar power plan was built and commissioned in just 90 days