Kodar Energomontaža built and put into operation a new solar power plant for the needs of OMV SERBIA DOO BELGRADE, with which our company officially entered the commercial phase of building solar systems.
The total installed power of the built power plant is: 63 kWp.
In the period of less than three months of operation of this power plant, savings of 13.7 tons of coal were achieved, CO2 gas emissions were reduced by 34.3 tons, and 1,890 trees were not cut down.
By building solar power plants, our society is moving in the direction of creating a sustainable and green energy sector, which implies a reduction in sulfur dioxide and carbon dioxide emissions, and thus cleaner air and a healthy environment.
Client: Terra Solar doo
Status: Completed May 2022