Within the shopping center “Gallery”, and for the needs of powering part of the promising consumption of Belgrade on water, through the EPC contract, we built a modern transformer station that will enable the development of this part of the city of Belgrade.

This project is specific because we have designed and built the first urban 110 / 10kV substation, which is completely located in the building of the Galerija shopping center, below ground level. From the idea to the realization, we finished the work in 14 months.